Tpo s long term heat uv and natural fungal resistance plus flexibility without need for plasticizers also make tpo a reliable low slope roofing system.
Single ply warm roof detail.
Single ply flat roof drainage best practice best practice dictates that flat roofs should expel rainwater quickly and effectively.
Below are links to all our products downloadable roof details and drawings.
In a warm roof the thermal insulation is immediately below the membrane finish the structural deck any voids and the ceiling are at a temperature close to that of the building s interior condensation control is achieved by using an air and vapour control layer avcl on the warm side of the insulation.
We try to help our clients in anyway possible.
The detail drawings are grouped by details and can be downloaded below in dwg or pdf format.
The table below show the appropriate combinations of single ply membranes fixing method and decking combination to achieve a high performance warm roof solution.
In a cold roof construction the sarnafil membrane is installed directly to the structural decking usually timber with firrings to fall.
Detailed drawings single ply 424 continuous endlap detail tpa 101 roof membrane layout wall tpa 102 roof membrane layout coated metal tpa 103 roof perimeter fastening plan detail 8 4 6.
The membrane is durable and resistant to european climate conditions tears and punctures yet incredibly lightweight typically 2 3kg per square metre.
Warm roof to coated metal drip edge.
Firestone has developed cad drawings of its tpo installation details to assist roofing professionals with the specification of firestone tpo roofing systems.
Single ply roofing systems are one of the most popular of flat roofing materials particularly advantageous if the project has weight and load bearing considerations.
Warm roof to outlet with sump gutter.
Warm roof to cable duct.
If you have any questions about a product please don t hesitate to call us we will help you get your roofing job done right the first time.
Warm roof to service penetration with pipe boot.
Warm roof to parapet outlet.
Warm roof to hot service penetration.
Stephen cleminson and daniel bosworth technical director and design manager at sig design technology explore the importance of adequately designed falls and drainage in achieving this.
Mechanically fixed insulation fully adhered membrane.
There must be an adequate void minimum 50mm between the deck and the insulation traditionally mineral wool to allow free movement of air and to prevent moisture vapour being transmitted from the building outwards where it could condensate in the roof.
Warm roof to outlet.